2026 Cleveland, OH Radon Mitigation System (Sub-Slab ASD) Cost Calculator
Calculate 2026 radon mitigation system (sub-slab asd) costs in Cleveland, Ohio (Greater Cleveland & Cuyahoga County). Calibrated with Cleveland metro NRPP Certified Radon Mitigator wages ($116/hr, +1% vs. U.S. Median), Cleveland Department of Building & Housing permits (~$185), and DOE Zone 5 (Cold).
Cleveland Radon Mitigation Calculator
2026 Cleveland, OH Radon Mitigation System (Sub-Slab ASD) Cost Table by Tier (1 Suction Points)
Turnkey pricing in Cleveland (Greater Cleveland & Cuyahoga County) calibrated with a +1% vs. U.S. Median labor index ($116/hr vs. $115/hr U.S. median) and $185 municipal permit fee:
| Specification Tier | Engineering Details | Cleveland Unit Cost / Suction Points | Cleveland Installed Total (1 Suction Points) |
|---|---|---|---|
| Exterior-Routed Active Sub-Slab Depressurization (ASD) | 5" Core Pit + 3"/4" Schedule 40 PVC + RadonAway Fan | $723.44 – $1255.98 | $1,350 – $2,050 |
| Interior Garage/Attic-Routed Concealed Radon System | Hidden Interior Chase Through Roof Flashing + U-Tube Manometer | $984.69 – $1657.89 | $1,625 – $2,450 |
| Sub-Slab ASD + Dirt Crawl Space High-Density Membrane Suction | Dual-Zone Basement Slab + Sealed Crawl Space Extraction | $1456.93 – $2461.72 | $2,100 – $3,250 |
Cleveland, OH Radon Mitigation FAQs (2026)
How much does radon mitigation system (sub-slab asd) cost in Cleveland, OH in 2026?
In Cleveland (Greater Cleveland & Cuyahoga County), a standard 1 Suction Points radon mitigation system (sub-slab asd) project costs between $1,350 and $3,250 in 2026. Licensed Cleveland contractors (BLS SOC 49-9021 / NRPP) bill an average loaded metro rate of $116/hour (+1% vs. U.S. Median), plus approximately $185 for municipal permits through Cleveland Department of Building & Housing.
What local Cleveland building codes and climate factors affect radon mitigation?
Lake-effect snow loads, freeze-thaw basement hydrostatic pressure, and aging brick-and-clay sewer laterals drive strong demand for cast-iron battery-backup sump pumps, French drains, and 96% AFUE furnaces. Cleveland is located in DOE Zone 5 (Cold) with a 99% winter design temperature of 4°F, 51°F groundwater inlet temperature, and 16.1¢/kWh residential electricity tariffs.
How does Cleveland compare to the Ohio statewide average for radon mitigation?
Contractor labor in the Greater Cleveland & Cuyahoga County carries a +4% metro labor adjustment compared to the Ohio statewide median. Eligible high-efficiency upgrades in Cleveland also qualify for Guaranteed < 2.0 pCi/L Post-Test.
Other 2026 Home & Auto Costs in Cleveland, OH
Cleveland Full Index →Compare Radon Mitigation System (Sub-Slab ASD) Cost Across U.S. Metro Cities
See how Cleveland, OH ($116/hr) compares to Ohio markets and top U.S. metropolitan areas: